Vermeer upgrade
Field evidence
in motion.
A single review surface for the real-input practice circuit, restart proof, authored grounds and helicopter route. Every frame is an exact ForgeMedia catalog image from the Shadow QA runs.
82cataloged WIP images
0 accepted final images
0 accepted final images
Review status: captures show verified interaction and route progress, while remaining visibly marked WIP. The HDD run proves shared-world real input, failure/reset/retry and scored results: both operators finished 2/3 depth gates with 40 seconds of penalties, with recorded exit offsets of 22.72 m and 18.47 m. The latest four helicopter frames are fully framed route WIP and show four authored service prop types; the heavy 1.5 m triangle crate remains deferred. Four additional HDD WIP frames are included: one 3/3 zero-penalty run that still failed the full steering gate, plus one cold-start timeout checkpoint. It does not claim a clean-perfect course, machine certification, final art approval, or production readiness.