ForgeFX Simulations
Internal design review · Round 02

Gantt Workbench + Executive Delivery

Direction

A shorter Gantt establishes the program clock. The lower field reports the delivery facts the team must act on: status, blockers, readiness, owners, critical path, and the next 30 days.

Five schedule chunks · Five milestone gates
KickoffPre-alphaAlphaBetaRC/GM
Original hierarchy with embedded timeline

Familiar Hero + Timeline

01

Preserves the existing split and messaging scale while introducing the five-stage schedule.

ForgeRail Gantt Workbench

Gantt Workbench

02

The cleanest direct blend: production schedule and executive facts beside the cab view.

Photo overlay delivery rail

Photo + Delivery Rail

03

Keeps the route image dominant and places the working schedule in a controlled overlay.

Project Timeline split

Project Timeline

04

A more operational left panel with the existing photography and strong ForgeRail hierarchy.

Original ForgeRail homepage reference

Original Reference

05 · CURRENT

The real production homepage remains the visual source of truth for every surrounding option.

Executive Overview split

Executive Overview

06

Balances the five milestones with risks, next actions, readiness, and live route imagery.

Full-width rail operations overlay

Route Operations Overlay

07

The most image-led expression, with the schedule and delivery strip anchored at the bottom.

Operations Brief

Operations Brief

08

A concise project-control brief with a purposeful cab-photo inset and minimal status reporting.

Project Control split

Project Control

09

The quietest ForgeRail-native blend: schedule, critical facts, next milestone, and route view.