ForgeFX Simulations
October 29, 2026 · Meeting Follow-Through

Marketing Work, Tracked

Thirteen issues connect the meeting’s next steps to working drafts, prototypes and review dependencies. Prepared material is not the same as an approved deliverable.

GitHub snapshot: 2026-11-01T18:42:04.029513+00:00 · Static overview, not an auto-refreshing board.

13Open issues
5In progress
8Blocked
12 + 1New + reused

Overview only. Drafts remain local and are not reproduced or linked for download here. No client outreach or production publication occurred in this drafting work.

Unlisted, link-accessible. This page is not private or authenticated. Crawler opt-out metadata is included, but does not enforce access control.

Build & Demonstrate

Adam’s Workstreams

Working local outputs exist. The five issues remain In Progress.

#2335 · NewIn Progress

Branded Creative Briefs

Working generator + branded specimen

Validated input produces a branded HTML brief; the editable source and verification notes are retained.

Next / dependency

Approved real source, Office-template integration and measured turnaround.

GitHub issue: OPEN · Deliverable: local draft
#1262 · ReusedIn Progress

Website Draft Automation

New-page + update drafts

Local draft creation and exact-match updates preserve source provenance and approval state. Existing issue reused; no competing website project.

Next / dependency

Approved copy, existing-site integration and staging review.

GitHub issue: OPEN · Deliverable: local draft
#2336 · NewIn Progress

November 17 Publishing Review

Review packet drafted

Evidence inventory, priorities and proposed review checkpoints are prepared. November 17 is a review checkpoint, not a publishing commitment.

Next / dependency

Consolidate evidence and approve each asset, destination and schedule separately.

GitHub issue: OPEN · Deliverable: local draft
#2337 · NewIn Progress

MINExpo Demo Exploration

Interactive decision prototype

Four-decision guided and assessment exercise with feedback, debrief and export. Not a 3D simulator or validated training.

Next / dependency

SME review, image permissions and demonstration-scope decision.

GitHub issue: OPEN · Deliverable: local draft
#2338 · NewIn Progress

November 3 Capabilities Tour

Presenter briefing drafted

Run-of-show, fallback content and readiness checklist prepared for the Forge Island tour.

Next / dependency

Native-build rehearsal and current runtime proof; automatic-tour readiness is not established.

GitHub issue: OPEN · Deliverable: local draft
Review & Approve

Team Assistance

Eight draft packages exist. Blocked means a source, review or permission dependency remains—not that no work was prepared.

Qualcomm & AI Glasses

Outreach + campaign outline drafted

Review material for a potential H1 2027 co-marketing discussion; prototype and production claims remain distinct.

Next / dependency

Marketing review, demonstrable capabilities and permissions. No outreach sent.

GitHub issue: OPEN · Deliverable: local draft

Unity Follow-Through

Three-part review pack drafted

Separate co-exhibit questions, TeleOp publication follow-up and licensing fact-check guidance.

Next / dependency

Written terms, submission identity and editorial review. No invitation or purchase made.

GitHub issue: OPEN · Deliverable: local draft

MINExpo Speaking & Tradeshow

Inquiry + decision brief drafted

Speaking concept, organizer questions and participation decision checklist prepared.

Next / dependency

Organizer timing and eligibility, approved examples and participation decision. No reservation made.

GitHub issue: OPEN · Deliverable: local draft

Somero Editorial Review

Review brief + bio handoff drafted

Technical review criteria and source-backed wording prepared; the unseen article has not been reviewed.

Next / dependency

Current article, bio subject and length, deadline and editorial approval.

GitHub issue: OPEN · Deliverable: local draft

TeleOp Page & Case Study

Two distinct copy drafts

Capability-page copy and a separate case-study draft are prepared, without unmeasured outcome claims.

Next / dependency

Program/version confirmation, approved images and credits, and Unity-story overlap review.

GitHub issue: OPEN · Deliverable: local draft

John Deere November Review

Customer-review package drafted

Case-study, portfolio-page and potential awards-use review materials prepared as separate approval requests.

Next / dependency

Product naming, developer credit, imagery and use-specific approvals. No award eligibility assumed.

GitHub issue: OPEN · Deliverable: local draft

GE Healthcare Case Study

First story + teaser drafted

Historical maintenance-training story and interview questions prepared; no new engagement or measured-results claim.

Next / dependency

Current naming, technical review, imagery permission and publication approval.

GitHub issue: OPEN · Deliverable: local draft

AES, Signature & Media Intake

Outline + intake materials drafted

AES editorial outline, signature-copy guidance and media-intake register prepared.

Next / dependency

Verified footage, permissions, narrative review and signature rendering tests. Nothing deployed.

GitHub issue: OPEN · Deliverable: local draft

Before Anything Ships

Confirm source facts and permissions. Review each asset independently. Verify the actual demo or publishing surface. Approve the destination and date explicitly.

The November 3 tour needs native rehearsal. The November 17 publishing review is a decision checkpoint, not blanket publication approval.