ForgeFX Simulations
FORGE ISLAND / ARCHITECTURAL EXPLORATION

Forge Studio: Timber + Iron

Six views of the current pavilion, restyled with warm structural timber, bolted black iron, charcoal roofs and integrated ForgeFX signage.

Concepts, not an implemented build. Left: fresh game-owned screenshots. Right: independent AI image edits anchored to each source camera and layout. Material, lighting and small geometry details are reconstructed, not pixel-identical.

01 Front approach

Current game: Front approach
Current gameForgeMedia ↗
Timber + Iron concept: Front approach
Timber + Iron conceptForgeMedia ↗

02 Left facade

Current game: Left facade
Current gameForgeMedia ↗
Timber + Iron concept: Left facade
Timber + Iron conceptForgeMedia ↗

03 Right facade

Current game: Right facade
Current gameForgeMedia ↗
Timber + Iron concept: Right facade
Timber + Iron conceptForgeMedia ↗

04 Rear facade

Current game: Rear facade
Current gameForgeMedia ↗
Timber + Iron concept: Rear facade
Timber + Iron conceptForgeMedia ↗

05 Entry & signage

Current game: Entry & signage
Current gameForgeMedia ↗
Timber + Iron concept: Entry & signage
Timber + Iron conceptForgeMedia ↗

06 Roof & site

Current game: Roof & site
Current gameForgeMedia ↗
Timber + Iron concept: Roof & site
Timber + Iron conceptForgeMedia ↗
Capture provenance & what happened to the earlier exploration

Captured 29 October 2026 from packaged Unreal Shipping build 2026.10.28.28, commit abdf77bd4a, on AREA51. All six are untouched 1920 × 1080 game-owned frames, with camera sidecars. No desktop capture or game modification. Latest passing package at initial discovery. Build 2026.10.29.1 finished while this fixed-baseline capture was starting; these are fresh captures, not a claim to that later build.

The 22 October source record describes a signage-only three-way exploration: precision steel, timber and iron, and anvil workshop, following Genevieve’s authentic-lettering / rough-hewn-anvil direction. It explicitly says concept art, not an Unreal capture.

Separate ForgeStudio work did continue: issue #1757 records pass 11 reaching packaged build 2026.10.22.18 on 23 October, with a warmer teak deck, split stair, and a slimmer cedar sign beam. That is evidence of continued pavilion work, not proof that the Timber + Iron signage option was implemented or approved.

Generated through the native ChatGPT/Codex subscription route, with no metered image-provider calls. Native concept dimensions are preserved. Original camera coordinates, capture sidecars, hashes and catalog lineage are retained in the local manifest.